We have put into use two sections of the express way S19!
Two sections of the S19 expressway built by Aldesa: Lublin / Węglin – Niedrzwica Duży and the Kraśnik bypass have been commissioned! They are components of a collision-free road connection between Lublin and Janów Lubelski with a total length of 47 km and further to Rzeszów. Aldesa designed and made:
10-kilometer section of the S19 expressway – the Kraśnik bypass. We have built 9 viaducts, 2 bridges and 2 animal crossings here. The road will separate transit traffic from local traffic, bypassing the town of Kraśnik. Thanks to collision-free intersections with national and local roads, the safety of travelers will be increased. The planned speed is 120 km / h. Number of lanes: 2 x 2, 3.5 meters wide; dividing strip width: 5m. Pavement load: 115 kN / axle. An additional task of the contract was the renovation of a nine-kilometer section of the national road No. 19. The value of the entire contract was PLN 320 million gross.
The 12-kilometer section of the S19 from the Lublin-Węglin junction to the Niedrzwica Duży junction. This is the first newly built fragment of an expressway, counting from Lublin. We have constructed 10 viaducts, 4 bridges, a footbridge, 16 culverts serving as ecological passages for amphibians and small animals, and two MOPs – Zemborzyce and Radawiec. The road will separate transit traffic from local traffic, freeing Niedrzwica, Strzeszkowice and other towns from increased car traffic on the narrow, dangerous and congested national road No. 19. The planned speed is 120 km / h. Number of lanes: 2 x 2, 3.5 meters wide; dividing strip width: 5m. The value of the entire contract was PLN 312.3 million gross.
A new and safe communication artery has been made available to drivers and travelers. We wish you a good road!